Reduced Schedule

Our process of continual improvement enables us to work faster and smarter on each and every job.

How Finfrock Achieves Reduced Schedule

  • Improved subsystem integration reduces scope or even eliminates subcontractors, which compresses the schedule
  • When codes allow it, Finfrock can erect 24 hours each day which can reduce the construction schedule by as much as 40-50%
  • Since buildings are erected by zone from foundation to roof, subcontractors have early access to structurally completed portions of the building, which speeds completion of buildings
  • By acting as the designer, precast/prestressed manufacturer and contractor, Finfrock has the ability to overlap schedules in each of these disciplines, which shortens the duration of the entire project
  • Finfrock’s precast/prestressed products have a high degree of dimensional accuracy, which reduces construction delays